Skip navigation
Por favor, use este identificador para citar o enlazar este ítem: https://repositorio.ufpe.br/handle/123456789/53135

Comparte esta pagina

Título : A risk management maturity model proposal for Brazilian public organisations
Autor : LORENA, Ana Luiza Freire de
Palabras clave : Engenharia de Produção; Gestão de riscos do setor público; Teoria da contingência; Estatística multivariada; Modelos de maturidade; Teoria dos conjuntos fuzzy
Fecha de publicación : 21-sep-2023
Editorial : Universidade Federal de Pernambuco
Citación : LORENA, Ana Luiza Freire de. A risk management maturity model proposal for Brazilian public organisations. 2023. Tese (Doutorado em Engenharia de Produção) – Universidade Federal de Pernambuco, Recife, 2023.
Resumen : Drawing on the literature concerning the contingency theory, maturity models, enterprise risk management and the fuzzy set theory, this thesis proposes a new maturity model to assess risk management (RM) implementation in Brazilian public organisations. In this sense, three main studies are presented. The first one explores RM implementation in Brazil through the support of government policymakers in 6 Brazilian states. Qualitative content analysis provides evidence that the policymakers employ strategies to approach public organisations with the aim to operationalise RM as contingent variables are perceived. These strategies are expected to attenuate the difficulties in progressing RM maturity due to some generally weak support from public top managers. The second study investigates which attributes and contingent factors are crucial to develop a public sector RM maturity model. Accordingly, a path of multivariate statistical techniques (CATPCA, K-modes, and multinomial logistic regression analysis) was used to analyse the data collected from 330 survey responses. Results reveal that 12 statistically significant variables explain 5 different levels of public sector RM maturity. The third study is a complement to the second one and proposes the PRisk-MM, a public sector RM maturity model that contains 5 levels of maturity and 23 maturity attributes related to 15 dimensions. The model was elaborated following the scientific rigour found in the literature on maturity models, being divided into 2 main phases: the development of the model and its validation in 3 public organisations of one state government. The assessment procedure of the model uses triangular fuzzy numbers to better treat the subjectivity and ambiguity of human judgement when analysing maturity dimensions and their attributes. This thesis has important practical implications as it demonstrates that RM is not always easily implemented in the public context, and higher levels of RM maturity are difficult to achieve. Therefore, the PRisk-MM was developed as a government tool that policymakers can use to assess the public organisations’ maturity status and compare their performance in implementing RM. Moreover, the PRisk-MM is adaptive to governments’ contexts and, once applied, presents prescriptions on what organisations must do to develop their RM practices.
URI : https://repositorio.ufpe.br/handle/123456789/53135
Aparece en las colecciones: Teses de Doutorado - Engenharia de Produção

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
TESE Ana Luiza Freire de Lorena.pdf
  Artículo embargado hasta 2025-10-18
1,57 MBAdobe PDFVisualizar/Abrir     Item embargoed


Este ítem está protegido por copyright original



Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons