Please use this identifier to cite or link to this item:
https://repositorio.ufpe.br/handle/123456789/68115
Share on
Full metadata record
| DC Field | Value | Language |
|---|---|---|
| dc.contributor.advisor | MOTA, Caroline Maria de Miranda | - |
| dc.contributor.author | ALMEIDA, Rodrigo Revoredo de | - |
| dc.date.accessioned | 2026-02-04T13:07:16Z | - |
| dc.date.available | 2026-02-04T13:07:16Z | - |
| dc.date.issued | 2025-12-17 | - |
| dc.date.submitted | 2026-01-24 | - |
| dc.identifier.citation | ALMEIDA, Rodrigo Revoredo de. Análise de risco e incerteza na rede de projeto: o caso de holding do setor energético. 2026. 62 f. Trabalho de conclusão de curso (Graduação) - Curso de Engenharia de Produção, Departamento de Engenharia de Produção, Centro de Tecnologia e Geociências, Universidade Federal de Pernambuco, Recife, 17 de dezembro de 2025. | pt_BR |
| dc.identifier.uri | https://repositorio.ufpe.br/handle/123456789/68115 | - |
| dc.description.abstract | O presente trabalho desenvolve e aplica um modelo de simulação para análise de prazos e custos em redes de projetos incertas, integrando técnicas probabilísticas, modelagem de riscos, diretos e condicionais, e dependências estruturais entre atividades. O modelo permite capturar com maior realismo os comportamentos aleatórios e correlacionados que ocorrem em projetos complexos. O sistema foi implementado em uma ferramenta online, possibilitando que gestores insiram seus dados em uma planilha padrão e obtenham automaticamente análises gráficas e tabelas. O modelo foi aplicado em um projeto de implementação de software em uma empresa holding com foco no setor energético. Os resultados da aplicação demonstram que o método é capaz de identificar riscos críticos, avaliar a sensibilidade do cronograma a cada atividade, revelar efeitos encadeados raramente captados por técnicas tradicionais e quantificar impactos que variam desde pequenos desvios frequentes até eventos extremos. A inclusão das dependências mostrou diferenças significativas nos percentis simulados, alterando tanto o comportamento das distribuições quanto à identificação de eventos de risco relevantes. Conclui-se que a solução proposta representa uma evolução metodológica em relação a modelos determinísticos e probabilísticos tradicionais, oferecendo uma abordagem mais aderente às dinâmicas reais dos projetos e contribuindo para uma gestão mais inteligente, preventiva e orientada à tomada de decisão baseada em dados. | pt_BR |
| dc.format.extent | 63p. | pt_BR |
| dc.language.iso | por | pt_BR |
| dc.rights | openAccess | pt_BR |
| dc.rights.uri | https://creativecommons.org/licenses/by-nc-nd/4.0/ | pt_BR |
| dc.subject | Gestão de projetos | pt_BR |
| dc.subject | Redes de projetos incertas | pt_BR |
| dc.subject | Análise de riscos | pt_BR |
| dc.title | Análise de risco e incerteza na rede de projeto: o caso de holding do setor energético | pt_BR |
| dc.type | bachelorThesis | pt_BR |
| dc.contributor.authorLattes | http://lattes.cnpq.br/2309762403882097 | pt_BR |
| dc.degree.level | Graduacao | pt_BR |
| dc.contributor.advisorLattes | http://lattes.cnpq.br/7211565565446890 | pt_BR |
| dc.description.abstractx | This paper develops and applies a simulation model for analyzing deadlines and costs in uncertain project networks, integrating probabilistic techniques, direct and conditional risk modeling, and structural dependencies between activities. The model allows for a more realistic capture of the random and correlated behaviors that occur in complex projects. The system was implemented in an online tool, allowing managers to enter their data into a standard spreadsheet and automatically obtain graphical analyses and tables. The model was applied to a software implementation project in a holding company focused on the energy sector. The results of the application demonstrate that the method is capable of identifying critical risks, assessing the sensitivity of the schedule to each activity, revealing chain effects rarely captured by traditional techniques, and quantifying impacts ranging from small frequent deviations to extreme events. The inclusion of dependencies showed significant differences in the simulated percentiles, altering both the behavior of the distributions and the identification of relevant risk events. It is concluded that the proposed solution represents a methodological evolution in relation to traditional deterministic and probabilistic models, offering an approach that is more in line with the real dynamics of projects and contributing to smarter, more preventive management oriented toward data-based decision-making. | pt_BR |
| dc.subject.cnpq | Áreas::Engenharias | pt_BR |
| dc.degree.departament | ::(CTG-DEP) - Departamento de Engenharia de Produção | pt_BR |
| dc.degree.graduation | ::CTG-Curso de Engenharia de Produção | pt_BR |
| dc.degree.grantor | Universidade Federal de Pernambuco | pt_BR |
| dc.degree.local | Recife | pt_BR |
| Appears in Collections: | (TCC) - Engenharia de Produção | |
Files in This Item:
| File | Description | Size | Format | |
|---|---|---|---|---|
| TCC Rodrigo Revoredo de Almeida.pdf | 2.65 MB | Adobe PDF | ![]() View/Open |
This item is protected by original copyright |
This item is licensed under a Creative Commons License